NR NR/L3/OPS/045/2.12 ISSUE 2 PDF

NR NR/L3/OPS/045/2.12 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/2.12 ISSUE 2 PDF

Published Date:
09/05/2020

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.12: Operational Development Day

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to the Head of Operations Principles & Standards team for the development and cascade of Operational Development Day briefing material.

This procedure covers the briefing of briefing of all operations employees who are briefed within a designated cycle rather than by the management briefing cascade process.

The process applies to the managers of operations employees, including:

1. Signallers;

2. Crossing Keepers;

3. Movable / Swing Bridge Operators;

4. Mobile Operations Managers;

5. Route Operations Controllers;

6. Electrical Control Operators; and

7. Other frontline Operational Managers and operations employees who are briefed within the designated cycle.

PURPOSE

This procedure provides a systematic and structured approach to the briefing and discussion of safety issues for all identified staff.

The purpose of the Operations Development Day is to:

a) Facilitate learning and development of staff;

b) Obtain the knowledge, skills, and abilities required for effective job performance; and

c) Provide employees with rule and regulation updates.


Edition : 2
File Size : 1 file , 350 KB
Number of Pages : 6
Published : 09/05/2020

History

NR NR/L3/OPS/045/2.12 ISSUE 2
Published Date: 09/05/2020
National Operating Procedure (NOP) 2.12: Operational Development Day
$7.5
NR NR/L3/OPS/045/2.12 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 2.12: Operational Development Day and Safety Briefings
$5.7

Related products

NR NR/L3/SCO/313/SP-1.10/FA1 ISSUE 3
Published Date: 06/01/2024
On-Track Machines (OTMs) Driver and Operations Standards Manual: Route Risk Assessment
$7.5
NR BRS-ST 100/3
Published Date:
Foot Frame Mechanism Assy Lifting Barrier (Auto) MK II B
$5.7
NR TEF 3027 ISSUE 2
Published Date: 06/01/2008
Cast Crossing Repair Report
$5.7
NR T02013 ISSUE 1
Published Date: 06/04/2005
Lineside & on Track Equipment Typical Circuits AWS Inductor Circuits (Special Controls)
$5.7

Best-Selling Products

IFAI CPAI-75
Published Date:
Rate of Burn Specifications for Sleeping Bags
$60
IFAI CPAI-84
Published Date: 01/01/2021
Specification for Flame-resistant Materials Used in Camping Tentage
IFAI MARINE FABRICATOR DESIGN
Published Date:
Marine Fabricator Design & Fabrication Manual
$17.4
IFAI STATE OF THE INDUSTRY
Published Date: 01/01/2021
State of the Industry
$187.8
IFAI USIFI-DTL 55308A
Published Date: 03/16/2010
Detail Specification — Cloth and Strip, Laminated or Coated, Vinyl, Reinforced, High Strength, Flexible
$37.2