Name:
NR NR/L3/OPS/045/2.15 ISSUE 2 PDF
Published Date:
06/02/2018
Status:
[ Revised ]
Publisher:
Network Rail
This procedure applies to:
a) Crossing Keepers;
b) Moveable Bridge Operators;
c) Shift Signaller Managers;
d) Mobile Operations Managers;
e) Route Operations Controllers; and
f) Electrical Control Room Operators.
Visits to signallers are covered in NR/L3/OPS/045/2.06.
PURPOSE
This procedure provides assurance that:
a) operational activities are being carried out correctly; and
b) equipment is being:
i) operated safely;
ii) operated in accordance with rules and Instructions; and
iii) maintained in good working order.
This includes visits to signalling locations.
| Edition : | 2 |
| File Size : | 1 file , 230 KB |
| Number of Pages : | 7 |
| Published : | 06/02/2018 |