NR NR/L3/OPS/045/3.04 ISSUE 1 PDF

NR NR/L3/OPS/045/3.04 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.04 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.04: Signalling and Permanent Way Alterations Preparation of Supplementary Signalling Notices

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure covers the complete process involved in producing a signalling notice and in particular:

  • identification of the need for the notice;

  • production of the draft notice;

  • validation of the draft notice;

  • distribution of the final notice.

NOTE: It does not include the training or familiarisation of staff in the application of the contents of the special notice.

PURPOSE

This procedure confirms that supplementary signalling and permanent way alteration notices (signalling notices) are written, produced, authorised and published in a consistent manner across the network, together with associated timescales. These notices contain details of significant signalling and permanent way alterations.

A signalling notice is provided to make sure that Train Operating Company (TOC) / Freight Operating Company (FOC) staff, Route Operations Control staff, signallers and all others who have a need to be on or about the line have consistent and clear information about significant changes to the infrastructure.

The supplementary signalling and permanent way alteration notices performs a primary role as a supplement to the Weekly Operating Notice (WON) and the information is not normally provided in both publications.


Edition : 1
File Size : 1 file , 230 KB
Number of Pages : 8
Published : 09/02/2017

History


Related products

NR T60078 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Junction Indicator (2 Positions) Acc: Electronic Interface (Pot/Clam) Peripheral Loc. - Loc. Case Circuit
$5.7
NR NR/L2/SIG/30097/APPB ISSUE 3
Published Date: 04/07/2014
Modular Signalling: Appendices B and B1: System Components
$13.2
NR SSI8003-103D ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - AHB Level Crossings - Bi-Directional - 2 Tracks - No Signals - Chapter D: Appendices (aka RT/SSI/8003-103D)
$7.5
NR NR/L3/TRK/1302 ISSUE 2
Published Date: 08/26/2008
Planning of Train Borne Grinding Works in Possession
$13.2

Best-Selling Products

VDMA 24568
Published Date: 03/01/1994
Fluidtechnik - Biologisch Schnell Abbaubare Druckfluessigkeiten - Technische Mindestanforderungen - GERMAN ONLY