Name:
NR NR/L3/OPS/045/3.09 ISSUE 1 PDF
Published Date:
09/02/2017
Status:
[ Withdrawn ]
Publisher:
Network Rail
This procedure applies to all level crossings on Network Rail’s Managed Infrastructure and all planning consultations with the potential to have an effect on level crossings located on Network Rail’s Managed Infrastructure.
PURPOSE
The purpose of this procedure provides a framework to allow Network Rail to respond to planning consultations and provides a process for maintenance of level crossing files as required by NR/L2/OPS/100. This procedure also provides a remit for Road Rail Partnership Groups (RRPGs).
| Edition : | 1 |
| File Size : | 1 file , 270 KB |
| Number of Pages : | 7 |
| Published : | 09/02/2017 |