Name:
NR NR/L3/OPS/045/3.18 ISSUE 2 PDF
Published Date:
06/03/2023
Status:
[ Revised ]
Publisher:
Network Rail
This procedure applies to Capacity Planning, the Freight Service Delivery Manager (FSDM) and Route Control. It helps them manage:
a) the planning and delivery of heritage trains; and
b) the safe operation and working of heritage trains predominantly during periods of perturbation.
This procedure applies to:
• steam traction;
• diesel traction;
• electric traction;
• heritage rolling stock; and
• fire risk.
PURPOSE
This procedure manages the safe operation of heritage trains on Network Rail Managed Infrastructure
| Edition : | 2 |
| File Size : | 3 files , 2.3 MB |
| Number of Pages : | 10 |
| Published : | 06/03/2023 |