NR NR/L3/OPS/045/3.18 ISSUE 3 PDF

NR NR/L3/OPS/045/3.18 ISSUE 3 PDF

Name:
NR NR/L3/OPS/045/3.18 ISSUE 3 PDF

Published Date:
06/01/2024

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.18: Operation and Control of Heritage Trains

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to Capacity Planning, the Freight Service Delivery Manager (FSDM) and Route Control. It helps them manage:

a) the planning and delivery of heritage trains; and

b) the safe operation and working of heritage trains predominantly during periods of perturbation.

This procedure applies to:

• steam traction;

• diesel traction;

• electric traction;

• heritage rolling stock; and

• fire risk. 

PURPOSE 

This procedure manages the safe operation of heritage trains on Network Rail Managed Infrastructure. 


Edition : 3
File Size : 2 files , 720 KB
Number of Pages : 10
Published : 06/01/2024

History

NR NR/L3/OPS/045/3.18 ISSUE 3
Published Date: 06/01/2024
National Operating Procedure (NOP) 3.18: Operation and Control of Heritage Trains
$7.5
NR NR/L3/OPS/045/3.18 ISSUE 2
Published Date: 06/03/2023
National Operating Procedure (NOP) 3.18: Operation and Control of Heritage Trains
$7.5
NR NR/L3/OPS/045/3.18 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.18: Operation and Control of Heritage Trains
$7.5

Related products

NR NB 115 ISSUE 1
Published Date: 11/01/2011
TPWS Base Plate Fuse Holders
$5.7
NR NR/CIV/SD/F003/620/ADD2 ISSUE B
Published Date: 06/01/2019
Relocatable Equipment Buildings & Trackside Equipment Housings: REBs & TEHs F003 Addendum
$18.6
NR NR/CIV/SD/819 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Bottom Flange Strengthening Details Alternative Arrangement (4 of 4)
$5.7
NR T60087 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Junction Indicator (3 Positions) Acc: Electronic Interface (Pot/Laps) Peripheral Location Circuit
$5.7

Best-Selling Products

ASHRAE 100-1995 Addendum b
Published Date: 1997
Addendum b - Energy Conservation in Existing Buildings
Free Download
ASHRAE 100-1995
Published Date: 1995
Standard 100-1995 -- Energy Conservation in Existing Buildings (ANSI Approved/IESNA cosponsored)
$11.1
ASHRAE 100-2006
Published Date: 2006
Standard 100-2006 -- Energy Conservation in Existing Buildings (ANSI/IES Approved)
$11.7
ASHRAE 100-2015 Addenda a
Published Date: 2017
Addenda a to Standard 100-2015 -- Energy Efficiency in Existing Buildings (ANSI Approved/IES Co-sponsored)
Free Download
ASHRAE 100-2015 Addenda b
Published Date: 2017
Addenda b to Standard 100-2015 -- Energy Efficiency in Existing Buildings (ANSI Approved/IES Co-sponsored)
Free Download
ASHRAE 100-2015 Addenda c
Published Date: 2017
Addenda c to Standard 100-2015 -- Energy Efficiency in Existing Buildings (ANSI Approved/IES Co-sponsored)
Free Download