NR NR/L3/OPS/045/3.20 ISSUE 1 PDF

NR NR/L3/OPS/045/3.20 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.20 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.20: New / Late Change To Planned Possessions & Communications Protocol

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This process applies to all planned engineering works which are planned under the Network Rail standards listed in clause 3. It shall apply to all Network Rail employees and all Network Rail contractors.

The provisions of this process do not apply to unplanned emergency engineering work, the need for which has resulted from an unexpected or previously unknown planned engineering possession or work arrangements during the +T-3 day period.

PURPOSE

The purpose of this module is to provide Network Rail Route Operations Controls with a process to manage late change for planned engineering works as defined in NR/L2/OPS/202 and NR/L3/OPS/303. This process mitigates the risk of abortive works and possession overruns and makes sure any changes to the planned works are managed safely and effectively.


Edition : 1
File Size : 1 file , 250 KB
Number of Pages : 9
Published : 09/02/2017

History


Related products

NR NR/CIV/SD/325 ISSUE E
Published Date: 09/02/2017
Earthwork Drains: Cascade Drain: CD2 Half-Round Plastic Profile
$5.7
NR NB 185 ISSUE 9
Published Date: 08/20/2024
Signal Maintenance Contingency Planning
$13.2
NR BR 962 ISSUE 5
Published Date: 09/01/1981
Specification for Miniature Relay Unit, Plug-In Type, for Railway Signalling Purposes Incorporating a D.C. Neutral Thermal Time Element Relay & an Independent Tractive Armature D.C. Neutral Line Relay
$18.6
NR X11440 ISSUE 3
Published Date: 12/03/2011
MCB-OD Typical Circuits Barrier Control Circuits
$5.7

Best-Selling Products