NR NR/L3/OPS/045/3.41 ISSUE 1 PDF

NR NR/L3/OPS/045/3.41 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.41 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Not for New Design ]

Description:

National Operating Procedure (NOP) 3.41: Route and Line Proving Process - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

The process is applicable to all Regions where a section of line has been closed for extreme weather or other operational reasons.

The process does not cover the move between Route Category Levels and reintroduction of a full operational service to lines following a period of reduced maintenance, service reduction and / or de-energisation (NR/L2/MTC/CP008 covers those situations).

PURPOSE 

The process manages the risks associated with lines that have been closed due to extreme weather conditions or for other operational reasons. There is also guidance provided to Route Controls to assist with decision making regarding the type of proving required and how it will be implemented.


Edition : 1
File Size : 2 files , 530 KB
Number of Pages : 9
Published : 06/03/2023

History

NR NR/L3/OPS/045/3.41 ISSUE 2
Published Date: 09/07/2024
National Operating Procedure (NOP) 3.41: Route and Line Proving Process
$7.5
NR NR/L3/OPS/045/3.41 ISSUE 1
Published Date: 06/03/2023
National Operating Procedure (NOP) 3.41: Route and Line Proving Process - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5

Related products

NR BRS-SM 632/1 ISSUE B
Published Date: 01/30/1990
Temporary Speed Restriction Warning Arrangements Side Plate for Adjustable Clamp - NSM Support
$5.7
NR NR/L2/CIV/169 ISSUE 2
Published Date: 12/04/2021
Design of Tunnels
$18.6
NR E10000/2/6 ISSUE D
Published Date: 01/25/1993
Block Circuits Block Bells Wiring Options
$5.7
NR TWI 2P023 ISSUE 1
Published Date: 03/01/2005
How to Recognise Seized Joints
$5.7

Best-Selling Products

ALPEMA STANDARDS ADDENDUM
Published Date: 06/01/2021
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
ALPEMA STANDARDS ADDENDUM
Published Date: 09/01/2020
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
ALPEMA STANDARDS ADDENDUM
Published Date: 05/01/2018
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
ALPEMA STANDARDS ADDENDUM
Published Date: 04/01/2022
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
ALPEMA STANDARDS
Published Date: 01/01/2024
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
$16.5
ALPEMA STANDARDS
Published Date: 01/01/2010
THE STANDARDS OF THE BRAZED ALUMINIUM PLATE-FIN HEAT EXCHANGER MANUFACTURERS’ ASSOCIATION
$16.5