NR NR/L3/OPS/045/4.15 ISSUE 2 PDF

NR NR/L3/OPS/045/4.15 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/4.15 ISSUE 2 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 4.15: Managing Stranded Trains and Train Evacuation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure provides the approach to be applied by Route Operations Control when dealing with the management of stranded trains and where trains are to be evacuated on Network Rail infrastructure.

PURPOSE

This procedure provides a risk based approach to maintain the safety and welfare of passengers when a train is stranded based on the relative risks. It minimises the risk involved in this type of incident and sets out how to develop plans to deal with such incidents.


Edition : 2
File Size : 1 file , 280 KB
Number of Pages : 7
Published : 06/02/2018

History

NR NR/L3/OPS/045/4.15 ISSUE 3
Published Date: 12/05/2020
National Operating Procedure (NOP) 4.15: Managing Stranded Passengers and Train Evacuation
$13.2
NR NR/L3/OPS/045/4.15 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 4.15: Managing Stranded Trains and Train Evacuation
$7.5

Related products

NR RT/ETE/2/1/11
Published Date: 03/17/1998
Brecknell Willis Ramp End Insulator Asc Conductor Rail
$5.7
NR NR/L2/TEL/30036 ISSUE 4
Published Date: 08/26/2008
Booster Transformer Outages: Managing the Consequences for Telecommunication Systems
$13.2
NR NR/FP C300 ISSUE 4
Published Date: 09/03/2011
Plant & Equipment Work Instructions: Unmanned Lineside Building Services
$5.7
NR NR/L2/SIG/11655 ISSUE 3
Published Date: 12/03/2011
Management of Cable & Wire Insulation
$7.5

Best-Selling Products