NR NR/L3/OPS/045/4.16 ISSUE 4 PDF

NR NR/L3/OPS/045/4.16 ISSUE 4 PDF

Name:
NR NR/L3/OPS/045/4.16 ISSUE 4 PDF

Published Date:
03/05/2022

Status:
[ Not for New Design ]

Description:

National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This procedure applies to the actions of frontline operational and Network Rail Route Control staff following a report of a fatality on the railway infrastructure and application of incident management (NR/L3/OPS/045/4.04 applies)

PURPOSE

This procedure mitigates the impact on train services and the welfare of both the response staff and the train driver following a person struck by a train or person involved in a fatality.

The risks being mitigated are severe impact on train services including overcrowding at stations in rear of the incident if this standard is not followed.  The risk of impact to mental health of both response staff and drivers will also be reduced by following the items included in this procedure.


Edition : 4
File Size : 1 file , 470 KB
Number of Pages : 9
Published : 03/05/2022

History

NR NR/L3/OPS/045/4.16 ISSUE 5
Published Date: 07/01/2023
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 4
Published Date: 03/05/2022
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 3
Published Date: 11/07/2020
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$5.7

Related products

NR X81130 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Auto Lower Circuits Signal Control Circuits
$5.7
NR T60125 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Standard Route Indicator (F. O. 4 Indications) Acc: Relay Interface Peripheral Location Circuit
$5.7
NR NR/L3/SIG/11303/2P05 ISSUE 2
Published Date: 09/04/2010
Signalling Installation Track Circuits: General
$13.2
NR NR/CIV/SD/TUM/800 ISSUE F
Published Date: 12/01/2018
Technical User Manual for Standard Metallic Bridge Repair and Strengthening - Standard Detail and Design Drawings
$24.3

Best-Selling Products

ACOUSTICS NOISE CONTROL
Published Date: 01/01/1996
$21
Calculus & Analytic Geometry
Published Date: 04/01/1996
$7.2