NR NR/L3/OPS/045/4.16 ISSUE 5 PDF

NR NR/L3/OPS/045/4.16 ISSUE 5 PDF

Name:
NR NR/L3/OPS/045/4.16 ISSUE 5 PDF

Published Date:
07/01/2023

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to the actions of frontline operational and Network Rail Route Control staff following a report of a fatality on the railway infrastructure and application of incident management (NR/L3/OPS/045/4.04 applies). 

PURPOSE

This procedure mitigates the impact on train services and the welfare of both the response staff and the train driver following a person struck by a train or person involved in a fatality.

The risks being mitigated are severe impact on train services including overcrowding at stations in rear of the incident if this standard is not followed. The risk of impact to mental health of both response staff and drivers will also be reduced by following the items included in this procedure.


Edition : 5
File Size : 1 file , 470 KB
Number of Pages : 10
Published : 07/01/2023

History

NR NR/L3/OPS/045/4.16 ISSUE 5
Published Date: 07/01/2023
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 4
Published Date: 03/05/2022
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 3
Published Date: 11/07/2020
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$7.5
NR NR/L3/OPS/045/4.16 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$5.7

Related products

NR NR/L2/SIG/30014/C210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
$13.2
NR NR/L3/MTC/ME0201/CAL308 ISSUE 1
Published Date: 06/07/2008
Calibration of Megger LT7 Digital Loop Tester
$5.7
NR T25202 ISSUE 1
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points Standard and In-Bearer Clamp Lock Applications (3)
$5.7
NR NR/L2/SIG/30009/A100 ISSUE 6
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions
$24.3

Best-Selling Products

SN-CEN/CLC/TR 14060:2014
Published Date: 12/03/2014
Medical device traceability enabled by unique device identification (UDI)
SN-CEN/CLC/TR 16103:2010
Published Date: 05/12/2010
Energy management and energy efficiency — Glossary of terms
SN-CEN/CLC/TR 16567:2013
Published Date: 09/18/2013
Energy Efficiency Obligation Schemes in Europe — Overview and analysis of main features and possibilities for harmonisation
SN-CEN/CLC/TR 16832:2015
Published Date: 04/24/2015
Selection, use, care and maintenance of personal protective equipment for preventing electrostatic risks in hazardous areas (explosion risks)
SN-CEN/CLC/TR 17602-70-23:2021
Published Date: 11/24/2021
Space product assurance — Materials, mechanical parts and processes obsolescence management handbook
SN-CEN/CLC/TR 17602-80-01:2021
Published Date: 11/24/2021
Space product assurance — Reuse of existing software