NR NR/L3/OPS/045/5.11 ISSUE 1 PDF

NR NR/L3/OPS/045/5.11 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/5.11 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 5.11: Management of Adverse Weather at Stations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This procedure applies to all common or exclusively controlled areas of Network Rail Managed Stations except:

  • St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

  • Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

Areas leased by tenants and other third parties (i.e. Train Operating Companies (TOCs), British Transport Police (BTP)) are the responsibility of the occupier.

PURPOSE

This procedure allows risks arising from weather to be managed to maintain station safely. This should be read in conjunction with NR/L3/OPS/045/3.17.


Edition : 1
File Size : 1 file , 160 KB
Number of Pages : 4
Published : 09/02/2017

History


Related products

NR NR/L2/ELP/27009/MOD C11 ISSUE 1
Published Date: 12/03/2011
Replacement of Plastic Dropper Sleeves Prone to Ultra Violet Degradation
$5.7
NR NR/L2/OHS/501 ISSUE 7
Published Date: 03/04/2023
Trackworker Protection and Warning Systems
$13.2
NR BRS-ST 86/10
Published Date:
Latch Telephone Door Lifting Barrier (Auto) MK II
$5.7
NR NR/L2/SIG/11201/MODA20 ISSUE 4
Published Date: 06/04/2011
Signalling Design Handbook: Dependability
$7.5

Best-Selling Products