NR NR/L3/OPS/045/5.12 ISSUE 1 PDF

NR NR/L3/OPS/045/5.12 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/5.12 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 5.12: Management of Risk and Change

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This procedure applies to all station operations, asset and infrastructure changes that affect the management of Network Rail Managed Stations except:

  • St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

  • Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

PURPOSE

This procedure outlines arrangements for managing risks arising from proposed changes to station operations, assets and infrastructure at Network Rail Managed Stations.


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 5
Published : 09/02/2017

History


Related products

NR SCS-SSP(003)-UG-8 ISSUE 4
Published Date: 01/30/2004
IECC Upgrade 003 Roll Out Briefing Note
$13.2
NR T25250 ISSUE 1
Published Date: 03/06/2010
Lineside & On Track Typical Circuits Points Clamp Lock MK2 Detection Circuits Using ITW Micro-Switches to NR/SP/SIG/10015 for Use with Double Slips
$5.7
NR BRS-SM 609/1 ISSUE B
Published Date: 08/19/1986
Post Mounted Signs Lampholder Mounting Brkt for Lamp Unit
$5.7
NR NB 042 ISSUE 1
Published Date: 04/01/2005
Automatic Warning System (AWS): Positioning of Track Equipment
$5.7

Best-Selling Products