NR NR/L3/OPS/251 ISSUE 3 PDF

NR NR/L3/OPS/251 ISSUE 3 PDF

Name:
NR NR/L3/OPS/251 ISSUE 3 PDF

Published Date:
09/07/2019

Status:
[ Revised ]

Description:

Unmanned Aircraft System (Drone / UAS) Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
CONTAINS NR/BS/LI/462

This work instruction applies to any person who wishes to operate drones or SUA near, on or over Network Rail infrastructure and details:

a) competency;

b) equipment;

c) proximity to Network Rail Infrastructure;

d) notification arrangements; and

e) accident reporting.

Purpose

This work instruction sets out:

a) the operating arrangements for in-house trained Drone Pilots, Framework Drone Pilots and Drone Pilots operating on behalf of lineside neighbours;

b) mitigates the risk of uncontrolled operation of Small Unmanned Aircraft (SUA / Drones) being operated near, on or over Network Rail infrastructure, as these may result in:

1) damage to overhead lines and electrical wires;

2) distractions for train drivers; and

3) system failure resulting in injury or derailment.

This document provides a process for compliance with the:

a) Air Navigation Order (ANO);

b) Civil Aviation Authority (CAA) Guidance Publication CAP 722; and

c) European Aviation Authority (EASA).


Edition : 3
File Size : 1 file , 910 KB
Number of Pages : 19
Published : 09/07/2019

History

NR NR/L3/OPS/251 ISSUE 4
Published Date: 09/04/2021
Unmanned Aircraft System (Drone/UAS) Operations
$13.2
NR NR/L3/OPS/251 ISSUE 3
Published Date: 09/07/2019
Unmanned Aircraft System (Drone / UAS) Operations
$13.2

Related products

NR NR/L3/OCS/044/FS-01C ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Planned General Inspections - Risk Assessment Template
$5.7
NR TWI 3G020 ISSUE 1
Published Date: 03/01/2005
How to Manage Sidings and Depots
$5.7
NR NR/L2/SIG/30009/D410 ISSUE 2
Published Date: 09/04/2021
Signalling Principles Handbook: Provision of Trapping Protection
$13.2
NR NR/L3/OPS/045/3.04 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.04: Signalling and Permanent Way Alterations Preparation of Supplementary Signalling Notices
$7.5

Best-Selling Products

Digital Protection for Power Systems
Published Date: 07/01/1995
$11.7
Insulators for High Voltages
Published Date: 01/01/1988
$35.7
Vacuum Switchgear
Published Date: 04/01/1994
$29.718