NR NR/L3/RMVP/0114 ISSUE 2 PDF

NR NR/L3/RMVP/0114 ISSUE 2 PDF

Name:
NR NR/L3/RMVP/0114 ISSUE 2 PDF

Published Date:
03/06/2010

Status:
[ Withdrawn ]

Description:

Audits, Wagon Condition Surveys & the Registration of Maintenance Sites

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-rmvp-0114-issue-2_2760305

Choose Document Language:
13.20 €
Need Help?
W/D * PDF ONLY

This standard applies to the activities undertaken by Network Rail in association with the PWRA. This includes the activities of the PWRA Team and Network Rail's Assurance Team.

Purpose

To describe the processes by which Network Rail verifies that

• Wagon maintenance sites are registered

• Wagons and maintenance sites are audited to establish that the requirements of the PWRA are met.


Edition : 2
File Size : 1 file , 580 KB
Number of Pages : 21
Published : 03/06/2010

History


Related products

NR NR/L2/RMVP/0200/P521 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: On-Track Plant Operations Scheme
18.60 €
NR NR/L2/SIG/30099/010 ISSUE 1
Published Date: 06/01/2012
Mechanical Locking: Lever Frame Overhaul (not including Mechanical Locking) - 10 Year Periodic Activity
5.70 €
NR T60211 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits TPWS - TSS & OSS Function. Acc: Relay Interface Peripheral Location Circuit
5.70 €
NR TWI 2G016 ISSUE 1
Published Date: 03/01/2005
How to Install Emergency Bridging Pieces
5.70 €

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants