NR NR/L3/SCO/204 ISSUE 1 PDF

NR NR/L3/SCO/204 ISSUE 1 PDF

Name:
NR NR/L3/SCO/204 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Switches and Crossings Recycling Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document applies to the processes for recycling of switches, crossings and other ancillaries at a Network Rail S&C recycling facility, items in scope include (list is not exhaustive);

  • Refurbishing Switches and Crossings,

  • Grinding and Welding,

  • Pressing,

  • Inspection,

  • Order processing.

  • Associated Forms

S&C and other ancillaries recovered from site are assessed and processed in accordance with the S&C Recycling standard NR/L2/TRK/063.

Purpose

This standard provides the requirements for the processing of serviceable switches, crossings and other ancillaries.

This standard provides the controls that reduce the risk associated by recycling S&C units, this creates serviceable S&C units from recovered items that would have otherwise been scrapped.

This standard controls the recycling methods and processes used at a Network Rail Switch and Crossing (S&C) Recycling Facility.


Edition : 1
File Size : 1 file , 860 KB
Number of Pages : 23
Published : 12/05/2020

History


Related products

NR NR/L2/TRK/3419 ISSUE 2
Published Date: 03/02/2024
Lifting, Storing and Transporting Track Materials
$18.6
NR NR/CIV/SD/620 ISSUE E
Published Date: 06/01/2019
Relocatable Equipment Buildings & Trackside Equipment Housings: Typical REB Foundation
$5.7
NR BRS-SM 2201/1 ISSUE E
Published Date: 10/12/1990
Rail Clamp Point Lock Mk 2 Cast Body Machining Details
$5.7
NR NR/L3/ELP/27240/NR/DIST C25K ISSUE 2
Published Date: 03/01/2017
Procedure for Replacement and Setting of Kinetrol Dampers Fitted to RJR High Speed Circuit Breakers
$7.5

Best-Selling Products