NR NR/L3/SCO/311/06 ISSUE 2 PDF

NR NR/L3/SCO/311/06 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/06 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module defines the monitoring requirements for SCO managed fleets by defining how audit and safety performance monitoring takes place.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 250 KB
Number of Pages : 11
Published : 03/02/2019

History

NR NR/L3/SCO/311/06 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
$13.2
NR NR/L3/SCO/311/06 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
$13.2

Related products

NR NR/L1/RVE/0001 ISSUE 2
Published Date: 01/01/2009
Design, Acquisition and Engineering Change of Rail Vehicles
$18.6
NR X82200 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits CCTV RX. Cubicle 110V Supply & Earthing Details
$5.7
NR RT/LS/G/00023 ISSUE 2
Published Date: 04/01/2004
Best Practicable Means: Control of Noise and Vibration from Construction Operations (aka NR/GN/ENV/00023)
$13.2
NR NR/CIV/SD/2157-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 8.4m External Unit Right Skew 45º
$5.7

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9