NR NR/L3/SCO/311/06 ISSUE 3 PDF

NR NR/L3/SCO/311/06 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/06 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sco-311-06-issue-3_2783618

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with The Railways and Other Guided Transport Systems(ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module defines the monitoring requirements for SCO managed fleets by defining how audit and safety performance monitoring takes place.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a)  Non-compliance with legislation and regulatory requirements.

b)  Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 3
File Size : 1 file , 210 KB
Number of Pages : 12
Published : 03/05/2022

History

NR NR/L3/SCO/311/06 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
13.20 €
NR NR/L3/SCO/311/06 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
13.20 €

Related products

NR BRS-SM 605 ISSUE C
Published Date: 08/24/1981
Post Mounted Signs Lamp Assembly
5.70 €
NR X20016 ISSUE 2
Published Date: 02/05/2000
ABCL Typical Circuits General Guidelines (2)
5.70 €
NR SSI8003-102B ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Core Data for Level Crossings - Bi-Directional Track - One Signal - Chapter B: Crossing Input TFM (aka RT/SSI/8003-102B)
18.60 €
NR NR/L3/CPR/303 ISSUE 1
Published Date: 03/01/2008
Principal Contractor: Licensing Requirements (aka NR/L3/INI/CP0071)
18.60 €

Best-Selling Products

A Practical Guide to the Machinery Directive
Published Date: 01/01/1996
111.00 €