NR NR/L3/SCO/311/13 ISSUE 2 PDF

NR NR/L3/SCO/311/13 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/13 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Planning and Supervision of Maintenance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This manual is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This instruction has been created to provide instructions on the arrangements for maintenance facilities and locations used for maintenance of the Supply Chain Operations (SCO) managed fleet.

This instruction provides minimum requirements for the planning and supervising of work to deliver safe maintenance.

This instruction replaces the requirement for depot registration as detailed in NR/L2/RVE/01327.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 270 KB
Number of Pages : 13
Published : 03/02/2019

History

NR NR/L3/SCO/311/13 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Maintenance Facilities, Planning and Supervision
$13.2
NR NR/L3/SCO/311/13 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Planning and Supervision of Maintenance
$13.2

Related products

NR RT/ETE/1/3/2
Published Date: 03/17/1998
Arrangement of Tapped Holes in Steel Conductor Rails for Fastening 1000mm sq. Aluminium Cable Lugs
$5.7
NR NR/CIV/SD/1133 ISSUE D
Published Date: 12/01/2018
Box Girder Underbridge Corrosion Protection: Bearings
$5.7
NR TEF 3105 ISSUE 1
Published Date: 02/01/2007
Plain Line Trial Hole & Soils Data Logging Schedule
$5.7
NR RT/E/S/40018 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Underfloor Wheel Lathe
$13.2

Best-Selling Products

AIIM 10197
Published Date: 01/01/1993
Micrographics — Readers - Printers for transparent microforms — Characteristics
AIIM 10198
Published Date: 01/01/1994
Micrographics — Rotary camera for 16mm microfilm — Mechanical and optical characteristics
AIIM 21
Published Date: 01/01/2009
Standard Recommended Practice Markup Language – Part 1: Stratml Core
AIIM 6198
Published Date: 01/01/1993
Micrographics — Readers for transparent microforms — Performance characteristics
AIIM 7565
Published Date: 01/01/1993
Micrographics — Readers for transparent microforms — Measurement of characteristics
AIIM MS10
Published Date: 01/01/1987
Method for Determining Adhesion of Protection Sheet to Aperture Adhesive of Unitized Microfilm Carrier (Aperture Card)
$15.3