NR NR/L3/SCO/311/17 ISSUE 1 PDF

NR NR/L3/SCO/311/17 ISSUE 1 PDF

Name:
NR NR/L3/SCO/311/17 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

The module details requirements for components that are required to be serialised and tracked using the Fleet Asset Management System (FAMS) in accordance with RIS-2706-RST. This is to maintain configuration control of components fitted to SCO managed assets.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On-Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 1
File Size : 1 file , 250 KB
Number of Pages : 9
Published : 06/02/2018

History

NR NR/L3/SCO/311/17 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
$7.5
NR NR/L3/SCO/311/17 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
$7.5

Related products

NR NR/L3/SIG/10663 ISSUE 17
Published Date: 12/02/2023
Signal Maintenance Specifications
$24.3
NR SSIDIS114 ISSUE 27
Published Date: 09/01/2018
Aspect Restriction Following Axle Counter Restoration
$24.3
NR BRS-SM 2202/2 ISSUE A
Published Date: 09/12/1990
Rail Clamp Point Lock MK 2 Adaptor Block Bush for 113A F.B. Vertical Track & Cast Steel Lock Body
$5.7
NR NR/L2/SIG/11201/MOD X21 ISSUE 5
Published Date: 12/02/2023
Signalling Design Handbook: Level Crossings - Manually Controlled Barriers with Obstacle Detection
$35.4

Best-Selling Products

AA 23
Published Date: 01/01/2002
Welding Aluminum: Theory and Practice, Fourth Edition, 2002
$27
AA 23
Published Date: 01/01/2002
Draft -- Welding Aluminum: Theory and Practice
AA AACP
Published Date: 01/01/2004
Aluminum Alloy Castings: Properties, Processes, and Applications, 2004
AA ADM-1
Published Date: 01/01/2005
Aluminum Design Manual, 2005
AA ADM-1
Published Date: 2010
Aluminum Design Manual, 2010 Edition
AA ADM-2020
Published Date: 2020
Aluminum Design Manual, 2020 Edition
$148.5