NR NR/L3/SCO/311/17 ISSUE 2 PDF

NR NR/L3/SCO/311/17 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/17 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

The module details requirements for components that are required to be serialised and tracked using the Fleet Asset Management System (FAMS) in accordance with RIS-2706-RST. This is to maintain configuration control of components fitted to SCO managed assets.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On-Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 230 KB
Number of Pages : 10
Published : 03/05/2022

History

NR NR/L3/SCO/311/17 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
$7.5
NR NR/L3/SCO/311/17 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
$7.5

Related products

NR NR/L3/ELP/27052/07 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions
$13.2
NR NR/CIV/SD/4108 ISSUE A
Published Date: 03/07/2020
Station Footbridges: Lift Details
$5.7
NR NR/L3/OPS/045/4.03 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 4.03: Emergency Arrangements
$5.7
NR NR/L2/RMVP/0200/P512 ISSUE 2
Published Date: 06/03/2017
Infrastructure Plant Manual: Powered Cutters and Saws
$7.5

Best-Selling Products

UNE-CEN/TS 1099:2009 EX
Published Date: 06/24/2009
Plywood - Biological durability - Guidance for the assessment of plywood for use in different use classes
UNE-CEN/TS 12169:2009 EX
Published Date: 10/28/2009
Criteria for the assessment of conformity of a lot of sawn timber
UNE-CEN/TS 12200-2:2004
Published Date: 11/12/2004
Plastics rainwater piping systems for above ground external use - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
UNE-CEN/TS 12201-7:2007 EX
Published Date: 05/23/2007
Plastics piping systems for water supply - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity
UNE-CEN/TS 12390-9:2008 EX
Published Date: 05/07/2008
Testing hardened concrete - Part 9: Freeze-thaw resistance - Scaling
UNE-CEN/TS 13001-3-1:2006 EX
Published Date: 06/14/2006
Cranes - General design - Part 3-1: Limit states and proof of competence of steel structures