NR NR/L3/SIG/10661 ISSUE 22 PDF

NR NR/L3/SIG/10661 ISSUE 22 PDF

Name:
NR NR/L3/SIG/10661 ISSUE 22 PDF

Published Date:
12/04/2021

Status:
[ Revised ]

Description:

Signalling Maintenance Task Intervals

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document applies to all staff that perform preventative or corrective maintenance to signalling assets on Network Rail managed infrastructure.

The intervals relate to the maintenance tasks defined in the Signal Maintenance Specifications, or that need to be applied for Reliability-Centred Maintenance.

Purpose

The purpose of this document is to set the safety and performance intervals applicable for carrying out signalling maintenance tasks and tests.

The intervals shown are intended to maintain the designed safety and reliability, by detecting and correcting deficiencies to signalling equipment before there is deterioration or failure.


Edition : 22
File Size : 1 file , 1.5 MB
Number of Pages : 34
Published : 12/04/2021

History

NR NR/L3/SIG/10661 ISSUE 26
Published Date: 06/01/2024
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 25
Published Date: 12/02/2023
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 24
Published Date: 06/03/2023
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 23
Published Date: 06/04/2022
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 22
Published Date: 12/04/2021
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 21
Published Date: 09/04/2021
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 20
Published Date: 12/05/2020
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 19
Published Date: 03/07/2020
Signalling Maintenance Task Intervals
$18.6

Related products

NR E10000/3/17 ISSUE B
Published Date:
Signal Controls in Semaphore Area. Fibre Optic Banner in Mechanical Area (3)
$5.7
NR NR/L3/ELP/SAI25/MOD Y ISSUE 2
Published Date: 12/02/2023
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sheffield Tram Train D.C. Overhead Electrified Lines
$13.2
NR BRS-SM 205/3 ISSUE E
Published Date: 03/27/1985
Crank 12 X 6 1/2 Acute for Compensator
$5.7
NR E10000/16/11 ISSUE A
Published Date: 02/01/1980
Point Machines - Detector Mechanism Clamp Lock Machines
$5.7

Best-Selling Products

ICAO 10000
Published Date: 2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Руководство по программам анализа полетных данных (ПАПД)
ICAO 10000
Published Date: 01/01/2021
Manuel sur les programmes d’analyse des données de vol (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)