NR NR/L3/SIG/10661 ISSUE 19 PDF

NR NR/L3/SIG/10661 ISSUE 19 PDF

Name:
NR NR/L3/SIG/10661 ISSUE 19 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Signalling Maintenance Task Intervals

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document applies to all staff that perform preventative or corrective maintenance to signalling assets on Network Rail managed infrastructure. The intervals relate to the maintenance tasks defined in the Signal Maintenance Specifications, or that need to be applied for Reliability-Centred Maintenance.

Purpose

The purpose of this document is to set the safety and performance intervals applicable for carrying out signalling maintenance tasks and tests. The intervals shown are intended to maintain the designed safety and reliability, by detecting and correcting deficiencies to signalling equipment before there is deterioration or failure.


Edition : 19
File Size : 1 file , 1.4 MB
Number of Pages : 30
Published : 03/07/2020

History

NR NR/L3/SIG/10661 ISSUE 26
Published Date: 06/01/2024
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 25
Published Date: 12/02/2023
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 24
Published Date: 06/03/2023
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 23
Published Date: 06/04/2022
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 22
Published Date: 12/04/2021
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 21
Published Date: 09/04/2021
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 20
Published Date: 12/05/2020
Signalling Maintenance Task Intervals
$18.6
NR NR/L3/SIG/10661 ISSUE 19
Published Date: 03/07/2020
Signalling Maintenance Task Intervals
$18.6

Related products

NR NR/L2/P3M/107/GUIDANCE ISSUE 1
Published Date: 09/17/2021
Contingency Management for Capital Delivery Projects, Programmes, and Portfolios - Technical Guidance Note: Forecasting Contingency Spend
$5.7
NR NR/L3/OPS/045/5.08 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 5.08: Management of Retail Activities
$5.7
NR SAO-IEC-HD-48 ISSUE 4
Published Date: 10/29/1999
Integrated Electronic Control Centre Data Preparation Manual IDPM 0902 Gateway Reference
$18.6
NR NR/CIV/SD/807 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Web Strengthening Trough Interface Type 4
$5.7

Best-Selling Products

TFF 100/107
Published Date: 2002
TEST
TFF 108
Published Date: 1993
TEST
TFF 109/510
Published Date: 1999
TEST
TFF 110
Published Date: 12/20/1986
TEST
TFF 110
Published Date: 2003
TEST
TFF 111
Published Date: 2002
TEST