NR NR/L3/SIG/11231 ISSUE 18 PDF

NR NR/L3/SIG/11231 ISSUE 18 PDF

Name:
NR NR/L3/SIG/11231 ISSUE 18 PDF

Published Date:
03/04/2023

Status:
[ Revised ]

Description:

Signal Maintenance Testing Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
CONTAINS TI 181

Signalling equipment that is replaced or renewed on a like for like basis under corrective maintenance, temporary design as a result of an incident or engineering works and minor signalling renewals that do not affect the application logic of the system or, the controls of the system that have previously been tested to signal orks testing.

Purpose 

This document contains the index to the Signal Maintenance Testing (NR/SMTH)The SMTH provides a maintenance testing regime for the replacement or installation of signalling equipment that does not affect the application logic of the system or, the controls of the system that have previously been tested to signal works testing.


Edition : 18
File Size : 1 file , 1.6 MB
Number of Pages : 72
Published : 03/04/2023

History

NR NR/L3/SIG/11231 ISSUE 19
Published Date: 12/02/2023
Signalling Maintenance Testing Handbook
$24.3
NR NR/L3/SIG/11231 ISSUE 18
Published Date: 03/04/2023
Signal Maintenance Testing Handbook
$24.3
NR NR/L3/SIG/11231 ISSUE 17
Published Date: 06/04/2022
Signal Maintenance Testing Handbook
$18.6
NR NR/L3/SIG/11231 ISSUE 16
Published Date: 09/04/2021
Signal Maintenance Testing Handbook (SMTH)
$18.6
NR NR/L3/SIG/11231 ISSUE 15
Published Date: 12/05/2020
Signal Maintenance Testing Handbook
$18.6
NR NR/L3/SIG/11231 ISSUE 14
Published Date: 03/07/2020
Signalling Maintenance Testing Handbook
$18.6

Related products

NR NR/OP/110 ISSUE 7
Published Date: 06/01/2019
Network Rail Adopted RISs
$5.7
NR NR/L2/RMVP/27176 ISSUE 3
Published Date: 09/05/2020
Controlled Emission Toilet Servicing Installation (aka NR/SP/ELP/27176)
$13.2
NR BRS-ST 110/2
Published Date:
Stantion St Andrew's Cross for Open Crossing Schedule
$5.7
NR NR/L2/ADG/002/10 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Processing - Collection
$7.5

Best-Selling Products

VDI/VDE/DGQ/DKD 2622 Sheet 10
Published Date: 06/01/2004
Calibration of measurement equipments for electrical quantities - High-frequency fieldstring meters
VDI/VDE/DGQ/DKD 2622 Sheet 11
Published Date: 09/01/2003
Calibration of measurement equipments for electrical quantities - Spectrum analyzers
VDI/VDE/DGQ/DKD 2622 Sheet 12
Published Date: 06/01/2004
Calibration of measurement equipment for electrical quantities - Test receiver
VDI/VDE/DGQ/DKD 2622 Sheet 15.4 - DRAFT
Published Date: 06/01/2007
Draft Document - Calibration of measuring equipment for electrical quantities - Passive measuring equipment for use in EMC-applications - Current clamps
VDI/VDE/DGQ/DKD 2622 Sheet 15.4
Published Date: 05/01/2010
Calibration of measuring equipment for electrical quantities - Passive measuring equipment for use in EMC-applications - Current clamps
VDI/VDE/DGQ/DKD 2622 Sheet 1
Published Date: 01/01/2001
Calibration of measuring equipment for electrical quantities - Fundamentals