NR NR/L3/SIG/19808 ISSUE 4 PDF

NR NR/L3/SIG/19808 ISSUE 4 PDF

Name:
NR NR/L3/SIG/19808 ISSUE 4 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Hy-Drive Supplementary Point Drive System

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This work instruction specifies:

1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure;

NOTE: This system is used in conjunction with an In-bearer Clamp lock to create the Hy-Drive Points System. This applies to systems that are used to operate switch lengths C to H switch on NR60/NR60

Mark 2 S & C and switch lengths F to G on NR56v S&C.

2) key differences between the Hy-Drive Mk1 and Mk2 designs (for NR60); and

3) differences introduced with the introduction of NR56v Hy-Drive.

This work instruction covers the Hy-Drive systems used in NR60 Mark 1, NR60 Mark 2 and NR56vS & C (shown in Table 1).

It applies to staff assessed as competent to install and maintain Hy-Drive Supplementary Point Drive systems.

Purpose

This work instruction supports the installation and maintenance of the Hy-Drive Supplementary Point Drive System. It is intended to control the risk of incorrect

componentry and set-up being applied in Hy-Drive systems. It is a reference document to support staff working with the system


Edition : 4
File Size : 1 file , 2.7 MB
Number of Pages : 36
Published : 03/07/2020

History

NR NR/L3/SIG/19808 ISSUE 5
Published Date: 06/03/2023
Hy-Drive Supplementary Point Drive System
$18.6
NR NR/L3/SIG/19808 ISSUE 4
Published Date: 03/07/2020
Hy-Drive Supplementary Point Drive System
$18.6

Related products

NR NR/L2/CIV/086/MOD05 ISSUE 1
Published Date: 09/02/2017
Management of Earthworks Manual: Earthwork Mitigations
$13.2
NR NR/CIV/SD/2151-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 8.4m External Unit Square Span
$5.7
NR NR/L3/OPS/043/9.1 ISSUE 4
Published Date: 12/03/2016
National Control Instructions (Formerly NR/L3/OCS/043): Management of Freight Services during Disruption
$7.5
NR NR/L2/CSG/10072 ISSUE 3
Published Date: 12/02/2023
Special Inspection Notices
$13.2

Best-Selling Products