This Work Instruction:
a) applies to Track engineering renewals and/or maintenance activities that might require the disturbance of signal engineering equipment, systems or cables.
NOTE: On DC Electrified lines this includes work on traction return bonding.
b) manages signal involvement in track engineering work.
Similar planning arrangements are contractually agreed where Network Rail:
a) is requested to provide signal engineering cover for outside parties; or
b) procures the services of a signal engineering subcontractor to support permanent way work.
It only applies where the Signal & Telecoms Maintenance Engineer authorises its use.
It modifies the Signal Maintenance Testing Handbook to allow certain track engineering work without signal engineering attendance and in particular NR/SMTH/Part4/TC00.
If the Signal & Telecoms Maintenance Engineer does not authorise implementation of this work instruction, the full requirements of the Signal Maintenance Testing Handbook shall be complied with.
Purpose
This Work Instruction:
a) reduces the risk of serious wrong side failures from the execution of track engineering work with inadequate signal engineering involvement;
b) confirms that signal engineering resources are coordinated in support of civil and track engineering work during maintenance and minor renewals so that:
1) signal engineering equipment is not damaged by the work;
2) no employee is subject to high voltages from track circuit equipment;
3) equipment is left operationally safe when the work is completed.
NOTE: Examples of track engineering work that requires signal engineering support are given in Appendix A and specific guidance on the “Like for Like” renewal of IRJs is given in Appendix E.
c) reduces unscheduled maintenance.
| Edition : | 3 |
| File Size : | 1 file , 1.2 MB |
| Number of Pages : | 31 |
| Published : | 09/03/2022 |