NR NR/L3/SIG/19810 ISSUE 2 PDF

NR NR/L3/SIG/19810 ISSUE 2 PDF

Name:
NR NR/L3/SIG/19810 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Revised ]

Description:

Signal Engineering Involvement in Civil Engineering Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Civil engineering renewals and/or maintenance activities that may require the disturbance of signal engineering equipment, systems or cables shall be managed in accordance with this instruction. On DC Electrified lines this includes work on traction return bonding.

This Work Instruction manages signal involvement in civil engineering work, but is only to be used where the Signal & Telecoms Maintenance Engineer authorises its implementation. It modifies the Signal Maintenance Testing Handbook to allow certain civil engineering work without signal engineering attendance and in particular NR/SMTH/Part4/TC00. If the Signal & Telecoms Maintenance Engineer does not authorise implementation of this work instruction, the full requirements of the Signal Maintenance Testing Handbook shall be complied with.

Purpose

To check that signal engineering resources are coordinated in support of civil and track engineering work for maintenance and minor renewals.


Edition : 2
File Size : 1 file , 270 KB
Number of Pages : 28
Published : 08/26/2008

History

NR NR/L3/SIG/19810 ISSUE 3
Published Date: 09/03/2022
Signal Engineering Involvement in Track and Civil Engineering Work
$18.6
NR NR/L3/SIG/19810 ISSUE 2
Published Date: 08/26/2008
Signal Engineering Involvement in Civil Engineering Work
$18.6

Related products

NR NR/L2/SIG/30009/A200 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$18.6
NR BRS-SE 179 ISSUE E
Published Date: 10/07/2000
Flashing Warning Road Lights Assembly
$5.7
NR NR/L3/P3M/132 ISSUE 2
Published Date: 03/05/2022
Consolidated Planning of Key Resources for Delivery of Planned Works (aka NR/L3/INI/P3M/132)
$18.6
NR BRS-SM 3221 ISSUE A
Published Date: 09/20/2015
Machine Operated Point Layout with Tubular Stretcher Bars - Full Depth SGV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7

Best-Selling Products