NR NR/L3/SIG/MG0081 ISSUE 2 PDF

NR NR/L3/SIG/MG0081 ISSUE 2 PDF

Name:
NR NR/L3/SIG/MG0081 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Inactive ]

Description:

Inspection of Level Crossings including Work Identification and Prioritisation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This document applies to all level crossings maintained by Network Rail. It covers both the non-technical inspection and repair activities for those level crossing inspector/maintainer individuals within the Track Maintenance Engineers (TME) organisation. It does not include specialist maintenance inspections of level crossing assets required by the company technical standards for Track, Signalling and E&P.

Purpose

This document details the process for the requirements of NR/L2/SIG/19608, specific to the non-technical inspection and repair of level crossing, are planned and delivered.

Due to the cyclic nature of work, this process should be constantly used to enable adequate planning of the required work on a week by week basis, an annual basis and inline with the Work & possession planning on the railway infrastructure process (see NR/L3/MTC/0056).


Edition : 2
File Size : 1 file , 640 KB
Number of Pages : 14
Published : 08/26/2008

History


Related products

NR NR/L3/SCO/313/SP-2.02 ISSUE 2
Published Date: 06/05/2021
On-Track Machines (OTMs) Driver and Operations Standards Manual: Urgent Safety Related Operating Advice
$7.5
NR NR/CIV/SD/1141 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Waterproofing: Standard Deck End Arrangement
$5.7
NR E10000/0/2C ISSUE 2
Published Date: 11/15/1990
Typical Interlocking Circuits General Notes (4)
$5.7
NR SSIDIS131 ISSUE 3
Published Date: 09/09/2005
Sequential Calling Of Point Ends With The Same Point Number at Balshaw Lane, Euxton
$7.5

Best-Selling Products