Name:
NR NR/L3/SIG/SG0138 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Active ]
Publisher:
Network Rail
This procedure applies to Network Rail maintenance staff who undertake signalling corrective maintenance, review, authorise escalation, and sign off of signalling wrong side failures.
For corrective maintenance to Right Side Failures, the process in NR/L3/SIG/SG0054 should be followed.
For corrective maintenance to Right on Arrival and Repeat Failures, the process in NR/L3/SIG/SG0139 should be followed.
Individual role/position responsibilities for this procedure are detailed in the RACI
Purpose
This document details the process for the investigation, escalation, rectification, and recording of signalling wrong side failures undertaken by maintenance in accordance to Network Rail company specifications NR/L2/SIG/10047 and NR/L2/SIG/11231.
| Edition : | 2 |
| File Size : | 1 file , 550 KB |
| Number of Pages : | 10 |
| Published : | 08/26/2008 |