NR NR/L3/TEL/0092 ISSUE 5 PDF

NR NR/L3/TEL/0092 ISSUE 5 PDF

Name:
NR NR/L3/TEL/0092 ISSUE 5 PDF

Published Date:
06/03/2017

Status:
[ Revised ]

Description:

Process for the Disconnection and at Risk Processes for Telecoms Bearer Circuits and Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the processes to be used when a telecommunications disconnection is required to Network Rail telecom assets or on any other equipment that can affect operational telecoms equipment. This process also applies to equipment deemed to be “At Risk” that might be affected by work being undertaken.

This standard applies to all people involved in planning approving and delivering disconnection/ “At Risk” work activities on operational telecoms equipment.

This standard does not apply to:

a) emergency works; or

b) route based instruments, for example concentrators/ phones.

Disconnection of individual telephone instruments and circuits as specified in NR/GI/E041 (NR/L3/SIG/10064) is not within the scope of the standard.

Purpose

The purpose of this standard is to define the processes to be followed and the requirement to reach a clear understanding when applying for and agreeing the method of temporary handover/ hand-back of Network Rail telecom assets or on any other equipment that can affect operational telecoms equipment that might carry safety critical circuits between NRT and authorised site engineer.

Application of this standard minimises the risk to the safety of the operational railway and personal injury to staff and customers of the railway.


Edition : 5
File Size : 1 file , 540 KB
Number of Pages : 13
Published : 06/03/2017

History

NR NR/L3/TEL/0092 ISSUE 6
Published Date: 06/04/2022
Process for the Application and Implementation of Planned Works Activities Across the Telecom Bearer, Circuits and Systems
$13.2
NR NR/L3/TEL/0092 ISSUE 5
Published Date: 06/03/2017
Process for the Disconnection and at Risk Processes for Telecoms Bearer Circuits and Systems
$13.2

Related products

NR TWI 3L005 ISSUE 1
Published Date: 03/01/2005
How to Manage Fencing in a Rural Environment
$5.7
NR SMF/SE/0468A ISSUE 1
Published Date: 09/01/2011
Record of On Site Surveillance - Track Teams
$5.7
NR BRS-ST 100/8
Published Date:
Clip (for Bell Cable) Mechanical Assembly Lifting Barrier (Auto) MK II B
$5.7
NR TWI 2P011 ISSUE 1
Published Date: 03/01/2005
How to Install Rail (in CWR)
$5.7

Best-Selling Products

3D Computer Graphics
Published Date: 12/06/1999
$18
Advanced Calculus
Published Date: 09/01/1999
$33.3
Advanced Engineering Mathematics
Published Date: 11/13/2000
$36.9
Crafting a Compiler with C
Published Date: 07/01/1991
$29.4
Mathematica for Calculus-Based Physics
Published Date: 01/07/1999
$8.1