NR NR/L3/TEL/0092 ISSUE 6 PDF

NR NR/L3/TEL/0092 ISSUE 6 PDF

Name:
NR NR/L3/TEL/0092 ISSUE 6 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Process for the Application and Implementation of Planned Works Activities Across the Telecom Bearer, Circuits and Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-tel-0092-issue-6_2776384

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This standard specifies the processes to be used when a telecommunications disconnection is required to Network Rail telecom assets or on any other equipment that can affect operational telecoms equipment. This process also applies to equipment deemed to be “At Risk” that might be affected by work being undertaken. This standard applies to all people involved in planning approving and delivering disconnection/ “At Risk” work activities on operational telecoms equipment. 

This standard does not apply to: 

  a) emergency works; or

  b) route based instruments, for example concentrators/ phones.

Disconnection of individual telephone instruments and circuits as specified in NR/GI/E041 (NR/L3/SIG/10064) is not within the scope of the standard. 

Purpose 

The purpose of this standard is to define the processes to be followed and the requirement to reach a clear understanding when applying for and agreeing the method of temporary handover/ hand-back of operational telecoms equipment that might carry safety critical circuits between Telecoms and the authorised site engineer. 

Application of this standard minimises the risk to the safety of the operational railway and personal injury to staff and customers of the railway.


Edition : 6
File Size : 1 file , 360 KB
Number of Pages : 15
Published : 06/04/2022

History

NR NR/L3/TEL/0092 ISSUE 6
Published Date: 06/04/2022
Process for the Application and Implementation of Planned Works Activities Across the Telecom Bearer, Circuits and Systems
13.20 €
NR NR/L3/TEL/0092 ISSUE 5
Published Date: 06/03/2017
Process for the Disconnection and at Risk Processes for Telecoms Bearer Circuits and Systems
13.20 €

Related products

NR NR/L2/CIV/191/02 ISSUE 2
Published Date: 06/03/2023
Mining Manual: Planning Consultations for Mineral Extraction
13.20 €
NR X11910 ISSUE 3
Published Date: 12/03/2011
MCB-OD Typical Circuits COD
5.70 €
NR RT/E/WI/27132 ISSUE 1
Published Date: 12/04/2004
Substation Plant, Remote Control and Protection Equipment Defect Reporting
13.20 €
NR NR/CIV/SD/F003/001 ISSUE B
Published Date: 12/01/2018
SDC Guidance Document for Technical Specifications for Interoperability: Package A
24.30 €

Best-Selling Products