NR NR/L3/TRK/1011 ISSUE 3 PDF

NR NR/L3/TRK/1011 ISSUE 3 PDF

Name:
NR NR/L3/TRK/1011 ISSUE 3 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Management of Permanent Way Inspections (aka NR/L3/MTC/TK0075)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The Procedure:

• Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to the following regular inspections as defined in NR/L2/TRK/001:

• Basic visual track inspection (including motorised inspection)

• Supervisor visual track inspection (including cab riding and renewal proposal identification)

• Track Maintenance Engineer visual track inspection (including cab riding and renewal proposal identification)

• Includes, but is not limited to the following detailed inspections as defined in NR/SP/TRK/001 and the related standards:

• Buffer stops

• Rail condition in tunnels

• Longitudinal timbers

• Switches secured out of use

• Handpoints

• Switches

• Crossings

• Rail in level crossings and Road Rail Access Points, (RRAPs)

• Lubricators

• Sidewear, gall and rail depth

• Includes, but is not limited to the following detailed inspections of lineside assets or factors:

• Access points and walkways

• Drainage

• Fencing and boundaries

• Litter, fly tipping, pests and graffiti

• Signs

• Vegetation

• Level crossing components

Purpose

This Procedure defines the standard process, roles and responsibilities for Permanent Way inspections on the network in accordance with Inspection and Maintenance of Permanent Way NR/L2/TRK/001 and Track Inspection Handbook NR/WI/TRK/001 and lineside standards as detailed in the references.


Edition : 3
File Size : 1 file , 360 KB
Number of Pages : 18
Published : 08/26/2008

History


Related products

NR NR/L3/SIG/19810 ISSUE 3
Published Date: 09/03/2022
Signal Engineering Involvement in Track and Civil Engineering Work
$18.6
NR BRS-SM 457
Published Date:
4" Centres Ground Frame Mild Steel Bars Details of Drilling
$5.7
NR NR/L2/RMVP/0131 ISSUE 1
Published Date: 12/05/2009
Design and Installation of Fuelling, Lubrication Oil and Coolant Storage and Delivery Systems
$18.6
NR BRS-ST 97/10 ISSUE C
Published Date: 02/01/1973
Label (Auto) MK II B Terminations (1 - 8) Flashing Lights
$5.7

Best-Selling Products