NR NR/L3/TRK/3250 ISSUE 2 PDF

NR NR/L3/TRK/3250 ISSUE 2 PDF

Name:
NR NR/L3/TRK/3250 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Post-Work Activities following Works Using On-Track Maintenance Machines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to all Non Enhanced Permissible Speed (EPS) lines in all Maintenance work sites where tampers, stone blowers, Dynamic Track Stabilisers and ballast regulators are used.

This procedure DOES NOT apply to EPS lines maintained to Absolute Geometry requirements.

Purpose

To confirm that On Track Machine (OTM) treatment works deliver the required results in terms of agreed outputs, productivity, track geometry and longevity by mandating activities after treatment has been completed.


Edition : 2
File Size : 1 file , 370 KB
Number of Pages : 12
Published : 08/26/2008

History


Related products

NR NR/L2/SIG/30014/C210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
$13.2
NR NB 124 ISSUE 1
Published Date: 06/24/2013
Lever Locks and Circuit Controllers - Contamination and Correct Set-up
$5.7
NR T02061 ISSUE 1
Published Date: 06/05/2021
Lineside & on Track Equipment Typical Circuits - AWS - “Vortok” Extra Strength (Green) Series 2 - Inductor Circuits: SSI 110V AC Electro & Suppressor
$5.7
NR BRS-SE 43/2 ISSUE A
Published Date: 06/06/1968
Electro-Magnetic-Indr. Stop for Dial Plate
$5.7

Best-Selling Products