NR NR/L2/SIG/30014/C210 ISSUE 5 PDF

NR NR/L2/SIG/30014/C210 ISSUE 5 PDF

Name:
NR NR/L2/SIG/30014/C210 ISSUE 5 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064 NR/GI/T001 (Testing – General) for testing to NR/L2/SIG/30014.The inclusions and exclusions documented in NR/L2/SIG/30014/A110 also apply to the scope of this Module.

Purpose

This Module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This Module specifies requirements for the acceptance of testing planning documentation by Network Rail before signalling works testing on Network Rail signalling infrastructure can proceed.


Edition : 5
File Size : 2 files , 770 KB
Number of Pages : 19
Published : 09/07/2024

History

NR NR/L2/SIG/30014/C210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 4
Published Date: 06/04/2022
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 3
Published Date: 12/07/2019
Signalling Works Testing Handbook: Signal Works Acceptance of Testing Planning Documentation
$13.2

Related products

NR NR/L3/SIG/11761/C020 ISSUE 4
Published Date: 06/04/2015
EBI Track 200/300/400 Track Circuits - Guidance Notes for Traction Bonding
$18.6
NR NR/L2/SIG/17002 ISSUE 28
Published Date: 09/03/2022
SSI Applications Manual Contents
$13.2
NR BR 1901 ISSUE A
Published Date: 04/01/1986
Solid State Interlocking Lineside Points Module
$18.6
NR NR/L2/SIG/11201/MOD A1-2 ISSUE 2
Published Date: 03/06/2021
Signalling Design Handbook: Signalling Design - Overview
$13.2

Best-Selling Products

IP 1/1994
Published Date: 01/01/1994
Methods of test for Petroleum and its products Part 1. Determination of acidity, neutralization value - Colour indicator titration method
$47.1
IP 1/74
Published Date: 01/01/1974
Acidity of Petroleum Products and Lubricants (Neutralization Value)
$27.6
IP 10/2011
Published Date: 07/31/2011
Methods of test for petroleum and its products Part 10: Determination of kerosine burning characteristics 24-hour method
$55.8
IP 10/65
Published Date: 01/01/1965
Determination of kerosine burning characteristics - 24 hour method
IP 10/65
Published Date: 01/01/1965
Burning test (24-hour) for kerosine
IP 10/94
Published Date: 01/01/1994
Methods of test for Petroleum and its products Part 10. Determination of kerosine burning characteristics - 24 hour method