NR NR/L3/TRK/3415 ISSUE 1 PDF

NR NR/L3/TRK/3415 ISSUE 1 PDF

Name:
NR NR/L3/TRK/3415 ISSUE 1 PDF

Published Date:
12/07/2019

Status:
[ Revised ]

Description:

Refurbishment of Switches & Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/L2/TRK/3415

This work instruction covers S&C refurbishment as defined in clause 6 of this document.It applies in all circumstances where S&C refurbishment is carried out on Network Rail infrastructure. It applies to all Network Rail and contracting staff that create problem statements, scope, specify, deliver works and handback the asset following S&C refurbishment works.

 

For clarity, this standard does not cover maintenance requirements for these assets or new construction as part of a renewal or enhancement. This work instruction does not supersede the requirement to comply with the Asset Management Plan (AMP) process.

 

NOTE:Maintenance requirements are covered by NR/L2/TRK/001. Design and construction of new assets is covered by NR/L2/TRK/2102. The AMP requirements are outlined in NR/L2/MTC/089.

 

Purpose

This document provides a process for the refurbishment of S&C assets. The aim of this process is to:

a) increase levels of workforce safety during construction on S&C refurbishment sites;

b) improve scoping and planning of S&C refurbishment works;

c) improve quality of S&C refurbishment works;

d) improve reliability of S&C assets following refurbishment works; and

e) deliver life extension of S&C assets and lower whole life cost in accordance with the Track Asset Policy

 

 


Edition : 1
File Size : 1 file , 670 KB
Number of Pages : 36
Published : 12/07/2019

History

NR NR/L2/TRK/3415 ISSUE 3
Published Date: 03/04/2023
Refurbishment of Switches and Crossings (aka NR/L3/TRK/3415)
$18.6
NR NR/L3/TRK/3415 ISSUE 2
Published Date: 03/06/2021
Refurbishment of Switches and Crossings
$18.6
NR NR/L3/TRK/3415 ISSUE 1
Published Date: 12/07/2019
Refurbishment of Switches & Crossings
$18.6

Related products

NR NR/L3/AMG/00114 ISSUE 3
Published Date: 06/01/2008
Buried Services Data Provision
$13.2
NR NR/CIV/SD/4157 ISSUE A
Published Date: 03/07/2020
Station Footbridges: Full Structure Sections & Elevations Sheet 5
$5.7
NR NR/L3/SIG/11303/2C10 ISSUE 2
Published Date: 09/04/2010
Signalling Installation Relays: Plugboard Configuration
$5.7
NR NR/OTK/SD/BM/105/SPEC ISSUE B02
Published Date: 12/04/2021
Class II Welded Mesh - Mesh Roll Steel Post Fence - Specification
$5.7

Best-Selling Products

IP-SHIELD CONFORMITY ASSESSMENT
Published Date:
IP-Shield: Conformity Assessment (Standards Education)
$18
IP-SHIELD COPYRIGHT AWARE
Published Date:
IP-Shield: Copyright Aware (includes overview with quiz and full course) (Standards Education)
$18
IP-SHIELD FINDING STANDARDS
Published Date:
IP-Shield: Finding Standards (Standards Education)
$18
IP-SHIELD STANDARDS AND TRADE
Published Date:
IP-Shield: Standards and Trade (Standards Education)
$18
IP-SHIELD STANDARDS AWARE SERIES
Published Date:
IP-Shield: Standards Aware Series (Standards Education)
$108
IP-SHIELD STANDARDS DEVELOPING ORGANIZATIONS
Published Date:
IP-Shield: Standards Developing Organizations (Standards Education)
$18