NR NR/L3/TRK/3415 ISSUE 2 PDF

NR NR/L3/TRK/3415 ISSUE 2 PDF

Name:
NR NR/L3/TRK/3415 ISSUE 2 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Refurbishment of Switches and Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/L2/TRK/3415

This work instruction covers S&C refurbishment as defined in clause 6 of this document. It applies in all circumstances where S&C refurbishment is carried out on Network Rail infrastructure. It applies to all Network Rail and contracting staff that create problem statements, scope, specify, deliver works and handback the asset following S&C refurbishment works.

For clarity, this standard does not cover maintenance requirements for these assets or new construction as part of a renewal or enhancement. This work instruction does not supersede the requirement to comply with the Asset Management Plan (AMP) process.

NOTE: Maintenance requirements are covered by NR/L2/TRK/001. Design and construction of new assets is covered by NR/L2/TRK/2102. The AMP requirements are outlined in NR/L2/MTC/089.

Purpose

This document provides a process for the refurbishment of S&C assets. The aim of this process is to:

a) increase levels of workforce safety during construction on S&C refurbishment sites;

b) improve scoping and planning of S&C refurbishment works;

c) improve quality of S&C refurbishment works;

d) improve reliability of S&C assets following refurbishment works; and

e) deliver life extension of S&C assets and lower whole life cost in accordance with the Track Asset Policy.


Edition : 2
File Size : 1 file , 720 KB
Number of Pages : 36
Published : 03/06/2021

History

NR NR/L2/TRK/3415 ISSUE 3
Published Date: 03/04/2023
Refurbishment of Switches and Crossings (aka NR/L3/TRK/3415)
$18.6
NR NR/L3/TRK/3415 ISSUE 2
Published Date: 03/06/2021
Refurbishment of Switches and Crossings
$18.6
NR NR/L3/TRK/3415 ISSUE 1
Published Date: 12/07/2019
Refurbishment of Switches & Crossings
$18.6

Related products

NR BRS-SM 884 ISSUE D
Published Date: 01/22/1990
Assembly of Fibre Optic Theatre Indicator
$5.7
NR NR/L2/OHS/019 ISSUE 12
Published Date: 06/03/2023
Safety of People at Work on or Near the Line
$18.6
NR NB 125/4 ISSUE 2
Published Date: 07/16/2014
'Simple is Effective' Non Provision of Emergency Signal on Control
$5.7
NR SF/CTM/305A ISSUE 1
Published Date: 06/05/2010
Standard CTM Form Reaction Level Evaluation - Post Course Questionnaire
$5.7

Best-Selling Products

UNE-CEN/TR 12401:2009 IN
Published Date: 10/28/2009
Dentistry - Guidance on the classification of dental devices and accessories
UNE-CEN/TR 12566-5:2010 IN
Published Date: 01/20/2010
Small wastewater treatment systems up to 50 PT - Part 5: Pre-treated Effluent Filtration systems
UNE-CEN/TR 13445-9:2009 IN
Published Date: 10/28/2009
Unfired pressure vessels - Part 9: Conformance of the EN 13445 series to ISO 16528
UNE-CEN/TR 13480-7:2003
Published Date: 01/17/2003
Metallic industrial piping . Part 7: Guidance on the use of conformity assessment procedures.
UNE-CEN/TR 13548:2007 IN
Published Date: 09/26/2007
General rules for the design and installation of ceramic tiling
UNE-CEN/TR 13688:2008 IN
Published Date: 12/22/2008
Packaging - Material recycling - Report on requirements for substances and materials to prevent a sustained impediment to recycling