Name:
NR NR/L3/TRK/3418 ISSUE 1 PDF
Published Date:
12/05/2020
Status:
[ Active ]
Publisher:
Network Rail
Within the scope of this standard is the repair of “cast - in” or “drill and glued”, damaged or broken housings and dowels in concrete sleepers and bearers.
Purpose
The purpose of this standard is to:
a) mitigate the risk of derailment through wide gauge,
b) control the methods used to repair concrete sleeper and bearer housings;
c) control methods of replacing dowels; and
d) document stakeholders’ responsibilities in the integrity or the repair .
| Edition : | 1 |
| File Size : | 1 file , 1.4 MB |
| Number of Pages : | 19 |
| Published : | 12/05/2020 |