NR NR/L3/TRK/3510/A01 ISSUE 1 PDF

NR NR/L3/TRK/3510/A01 ISSUE 1 PDF

Name:
NR NR/L3/TRK/3510/A01 ISSUE 1 PDF

Published Date:
03/05/2011

Status:
[ Revised ]

Description:

Lubrication of Plain Line Running Rails, Check Rails and S&C

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
CONTAINS NR/BS/LI/305, NR/BS/LI/428

Unless otherwise stated, the requirements of this standard shall apply to all rail-mounted gauge face and check rail lubricator systems fitted or proposed to be fitted to running and check rails, plain line and S&C.

This standard applies to permanent way that is undergoing renewal as well as to permanent way which is in normal maintenance.

Purpose

This standard gives the minimum requirements for the installation, inspection, filling and maintenance of rail-mounted gauge face lubrication systems designed and approved for Network Rail's permanent way.

NR/L3/TRK/3510/A01 supersedes and replaces Level 2 standard NR/L2/TRK/8006 (Issue 2) which is withdrawn.


Edition : 1
File Size : 1 file , 660 KB
Number of Pages : 35
Published : 03/05/2011

History

NR NR/L3/TRK/3510/A01 ISSUE 2
Published Date: 09/04/2021
Rail Friction Management: Lubrication of Plain Line Running Rails, Check Rails and S&C
$18.6
NR NR/L3/TRK/3510/A01 ISSUE 1
Published Date: 03/05/2011
Lubrication of Plain Line Running Rails, Check Rails and S&C
$18.6

Related products

NR BRS-ST 69
Published Date:
Location Cupboards Concrete Base Details
$5.7
NR SMF/PL/0275 ISSUE 2
Published Date: 12/01/2009
Work Pack Checklist
$5.7
NR BRS-SM 882/20 ISSUE C
Published Date: 01/22/1990
Fibre Optic Theatre Indicator Packing - Transformer for Equipment Rack
$5.7
NR NR/L3/ELP/27240/NR/DIST C16G ISSUE 3
Published Date: 03/01/2017
Isolation and Earthing for Feeder Switch Maintenance for A.C. Electrified Lines
$5.7

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants