NR NR/L3/TRK/7014 ISSUE 1 PDF

NR NR/L3/TRK/7014 ISSUE 1 PDF

Name:
NR NR/L3/TRK/7014 ISSUE 1 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Inspection and Maintenance of Permanent Way Using Risk Based Maintenance (Plain Line CWR Track)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
SUPERSEDED BY NR/L2/TRK/7014

This standard applies to revised inspection and maintenance regimes for plain line track system assessed using the Reliability Centred Maintenance process (NR/L2/MTC/10662) of the following assets on running lines:

a) plain line flat bottom Continuously Welded Rail (CWR) – Regardless of PLPR status;

b) line speed 125mph or less; and

c) axles loads 25.5tonnes or less.

The scope of this standard excludes:

d) switches & crossings;

e) bull head rail;

f) adjustment switches;

g) jointed track;

h) buffer stops;

i) slab track;

j) long timber bridges;

k) complex or non-standard layouts;

l) off track features (fences / none track drainage / vegetation); and

m) non-running lines

NOTE: These excluded assetsl continue to be inspected and maintained as mandated in modules NR/L2/TRK/001 unless bespoke Risk Based Maintenance regimes are agreed and implemented as per NR/L2/MTC/10662

The scope of this standard excludes the following inspections:

n) Track Maintenance Engineer inspections

o) Super Red’ inspections

p) ‘Very Poor’ eighth inspections

Purpose

This standard defines alternative inspection and maintenance regimes to those mandated in NR/L2/TRK/001 based on the application of Risk Based Maintenance (RBM). This simplifies the implementation of Risk Based Maintenance regimes detailed in NR/L2/MTC/10662/05.


Edition : 1
File Size : 1 file , 800 KB
Number of Pages : 54
Published : 03/06/2021

History

NR NR/L2/TRK/7014 ISSUE 2
Published Date: 03/05/2022
Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way (aka NR/L3/TRK/7014)
$13.2
NR NR/L3/TRK/7014 ISSUE 1
Published Date: 03/06/2021
Inspection and Maintenance of Permanent Way Using Risk Based Maintenance (Plain Line CWR Track)
$24.3

Related products

NR SSI8505-C ISSUE 5
Published Date: 09/03/2022
Data Production
$18.6
NR NR/L3/OPS/045/3.13 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.13: Assistance for Disabled, Stranded and Failed Trains (Railway Operational Code)
$7.5
NR E10007/50 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Non-Vital UKE & TKE Circuits on Switch Diamonds
$5.7
NR NR/L2/SIG/11201/MOD X39 ISSUE 2
Published Date: 03/06/2021
Signalling Design Handbook: System Application Specification for Overlay Miniature Stop Light Level Crossings
$13.2

Best-Selling Products

SN-CEN/CLC Guide 10:2015
Published Date: 02/18/2015
Policy on dissemination, sales and copyright of CEN-CENELEC Publications
SN-CEN/CLC Guide 10:2018
Published Date: 01/24/2018
Policy on dissemination, sales and copyright of CEN-CENELEC Publications
SN-CEN/CLC Guide 10:2024
Published Date: 02/16/2024
Policy on the distribution, sale and copyright of CEN and CENELEC Content
SN-CEN/CLC Guide 11:2012
Published Date: 11/07/2012
Product information relevant to consumers — Guidelines for standard developers
SN-CEN/CLC Guide 12:2016
Published Date: 06/15/2016
The concept of Affiliation with CEN and CENELEC
SN-CEN/CLC Guide 13:2016
Published Date: 06/15/2016
The concept of Partner Standardization Body with CEN and CENELEC