NR NR/PRC/MPI/TK0027 ISSUE 1 PDF

NR NR/PRC/MPI/TK0027 ISSUE 1 PDF

Name:
NR NR/PRC/MPI/TK0027 ISSUE 1 PDF

Published Date:
01/19/2006

Status:
[ Revised ]

Description:

Test & Inspection Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
SUPERSEDED BY NR/L3/INI/TK0027

The procedure shall apply to all track renewals work where Trax re-ballasting, or Trax formation works has been specified as a works deliverable.

PURPOSE

This document defines the procedures that must be followed and the documentation that must be used for recording hidden works compliance to NR Standards, Site Particular Specifications and the Contract Technical Specification, on track renewal sites delivered by the MP&I (Track) Programme.


Edition : 1
File Size : 1 file , 160 KB
Number of Pages : 10
Published : 01/19/2006

History

NR NR/L3/TRK/0027 ISSUE 3
Published Date: 03/06/2021
Excavation and Ballast as Built (aka NR/L3/INI/TK0027)
$13.2
NR NR/L3/INI/TK0027 ISSUE 2
Published Date: 06/01/2008
Test & Inspection Plan
$7.5
NR NR/PRC/MPI/TK0027 ISSUE 1
Published Date: 01/19/2006
Test & Inspection Plan
$7.5

Related products

NR NR/L3/SIG/11767/D020 ISSUE 5
Published Date: 08/06/2012
Handbook for EBI Track 400 Audio Frequency Track Circuit: EBI Track 200 TI21 - Summary of Fusing and Surge Arrestor Arrangements
$7.5
NR T25110 ISSUE 4
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points Clamp Locks - Double End Location Control and Split Detection Line Circuits Two Locations - Loc 1
$5.7
NR NR/BS/LI/054 ISSUE 1
Published Date: 08/04/2006
Letter of Instruction: Maintenance and Operation of WS Switchgear
$7.5
NR NR/OP/110 ISSUE 24
Published Date: 03/01/2024
Network Rail Adopted RISs
$5.7

Best-Selling Products

USACE CEGS-07416
Published Date:
Structural Standing Seam Metal Roof (SSSMR) Systems
$6.6