NR NR/L3/INI/TK0027 ISSUE 2 PDF

NR NR/L3/INI/TK0027 ISSUE 2 PDF

Name:
NR NR/L3/INI/TK0027 ISSUE 2 PDF

Published Date:
06/01/2008

Status:
[ Revised ]

Description:

Test & Inspection Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
SUPERSEDED BY NR/L3/TRK/0027

The procedure shall apply to all track renewals work where Trax re-ballasting, or Trax formation works has been specified as a works deliverable.

PURPOSE

This document defines the procedures that must be followed and the documentation that must be used for recording hidden works compliance to NR Standards, Site Particular Specifications and the Contract Technical Specification, on track renewal sites delivered by the Infrastructure Investment Track Programme.


Edition : 2
File Size : 1 file , 520 KB
Number of Pages : 10
Published : 06/01/2008

History

NR NR/L3/TRK/0027 ISSUE 3
Published Date: 03/06/2021
Excavation and Ballast as Built (aka NR/L3/INI/TK0027)
$13.2
NR NR/L3/INI/TK0027 ISSUE 2
Published Date: 06/01/2008
Test & Inspection Plan
$7.5
NR NR/PRC/MPI/TK0027 ISSUE 1
Published Date: 01/19/2006
Test & Inspection Plan
$7.5

Related products

NR NR/GN/SIG/19054-1 ISSUE 3
Published Date: 06/04/2022
SSI Technicians' Manual: Introduction
$7.5
NR NR/L3/ELP/27240/NR/DIST C10J(A) ISSUE 3
Published Date: 03/01/2017
Method of Applying Zone Reach and Timer Settings to DZA and AKE Protection Relays Using BR DZ Test Set
$7.5
NR BRS-ST 83/1 ISSUE A
Published Date: 03/15/1966
Schedule Flashing Light Unit Lifting Barrier (Auto) MK II
$5.7
NR NR/CIV/SD/1800 ISSUE D
Published Date: 03/01/2019
Underbridge Ancillaries: Index of Drawings
$5.7

Best-Selling Products

CAN/CSA-IEC/TS 61000-3-5:12 (R2021)
Published Date: 06/01/2012
Electromagnetic compatibility (EMC) - Part 3-5: Limits - Limitation of voltage fluctuations and flicker in low-voltage power supply systems for equipment with rated current greater than 75 A (Adopted IEC/TS 61000-3-5:2009, edition 2.0, 2009-07)
$14.1
CAN/CSA-IEC/TS 62600-4:22
Published Date: 10/18/2022
Marine energy -- Wave, tidal and other water current converters -- Part 4: Specification for establishing qualification of new technology
$46.8