NR NR/SIN/111 ISSUE 1 PDF

NR NR/SIN/111 ISSUE 1 PDF

Name:
NR NR/SIN/111 ISSUE 1 PDF

Published Date:
11/01/2010

Status:
[ Withdrawn ]

Description:

Lever Modification Upgrade to Arthur Flury Single Rod Neutral Sections

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This SIN applies to all Single Rod Arthur Flury Neutral Sections installed in Network Rail infrastructure (all line speeds). All future orders will include these design features by default.

Background and purpose

There have been a number of recent pan damage incidents associated with the introduction of Arthur Flury single rod neutral sections in high speed lines. This has resulted in an update to the design and associated product approval of this component.

The design now includes an additional lever which flexes the contact wire/insulation ferrule joint upwards at the interface between the contact wire and the ferrule. The pantograph will then be subject to less of a hard spot and hence an improved transition across this interface joint.

This is now the only approved product for AF Single Rod Neutral Sections for use on Network Rail Infrastructure.

The lever assembly (see picture 2) includes a new leading arcing horn which has been improved by the addition of a strengthening bar.

The cost of the upgrade per unit is £440.00 for the kit of parts and a marginal labour cost of £284 - giving a total cost of £724 per unit.

The total number of in scope Neutral Sections is 156, this is based on 52 - LNW(N), 69 - LNW(S), 4 - LNE and 31 – Anglia. Total estimated cost is therefore circa £113k.


Edition : 1
File Size : 1 file , 280 KB
Number of Pages : 9
Published : 11/01/2010

History


Related products

NR NR/L3/CIV/140/110N ISSUE 2
Published Date: 12/01/2008
Model Clause 110N: General Requirements for Waterproofing Underline Bridges
$7.5
NR NR/L3/OPS/045/4.08 ISSUE 2
Published Date: 01/06/2024
National Operating Procedure (NOP) 4.08: Reporting of Dangerous Goods Incidents
$5.7
NR NR/L3/OCS/043/5.3 ISSUE 3
Published Date: 06/04/2011
National Control Instructions: Accidents, Derailments and Collisions
$5.7
NR BRS-SM 2061 ISSUE C
Published Date: 03/08/1995
Colour Light Signals General Assembly of Signals for 1262 Wide Platform with Central Post & Footstep
$5.7

Best-Selling Products

NEN NEN 1006+A1
Published Date: 06/01/2018
Algemene voorschriften voor leidingwaterinstallaties
$15.9
NEN NEN 1010
Published Date: 01/01/2020
Elektrische installaties voor laagspanning – Nederlandse implementatie van de HD-IEC 60364-reeks
$130.8
NEN NEN 1059
Published Date: 06/01/2019
Nederlandse editie op basis van NEN-EN 12186 en NEN-EN 12279 - Gasvoorzieningsystemen - Gasdrukregel- en meetstations voor transport en distributie
$26.4
NEN NEN 11298-2
Published Date: 10/01/1995
Process measurement and control devices - General methods and procedures for evaluating performance - Part 2: Test under reference conditions
$17.1
NEN NEN 2075
Published Date: 09/01/2018
Quality measuring system and process control system for cleaning performance
$19.8
NEN NEN 2767‐1+C1
Published Date: 05/01/2019
Condition assessment built environment ‐ Part 1: Methodology
$21.3