Name:
NR NR/SIN/140 ISSUE 1 PDF
Published Date:
10/03/2014
Status:
[ Withdrawn ]
Publisher:
Network Rail
This SIN applies to all station platforms.
The appointed contractor is to prepare, plan, execute and report on the inspection / survey results with respect to the stated issue
Purpose
This Special Instructoin Notice (SIN) is issued following two incidents reported recently involving a baby push chair and a wheelchair rolling towards the edge of a platform. It requires Route Asset Managers [Buildings] responsible for station platforms as part of the Operational Property portfolio to:
a) instruct and manage an inspection / examination of platform gradients by utilising the current CEFA contractor or a competent surveyor; and
b) identify if a hazardous cross-fall exists (platform surface sloping towards the rear of the coper).
| Edition : | 1 |
| File Size : | 1 file , 370 KB |
| Number of Pages : | 14 |
| Published : | 10/03/2014 |