NR NR/SIN/156 ISSUE 1 PDF

NR NR/SIN/156 ISSUE 1 PDF

Name:
NR NR/SIN/156 ISSUE 1 PDF

Published Date:
07/20/2016

Status:
[ Withdrawn ]

Description:

Non-650V Isolated Terra Functional Supply Points in Public Locations - **NR/SIN/156 Part 1 SINACS - received from all routes. Part 1 closed 31/03/2017**

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

All FSPs in public locations, containing signalling poweef distribution voltages above 175V but less than 650V, operating as part of a signalling power supply system with an isolated terra earthing arrangement.

Purpose

The purpose of this Special Inspection Notice is to remove defects identified by SIN119, or other equally effective means, on Functional Supply Points (FSPs) in public locations that are not within the scope of the Route TBAPs. This includes Isolated Terra (IT) systems operating above 175 Volts (V) but excluding 650 V IT systems.


Edition : 1
File Size : 1 file , 2 MB
Number of Pages : 27
Published : 07/20/2016

History


Related products

NR NR/L3/TRK/3407 ISSUE 3
Published Date: 08/26/2008
Management of Rail Welding
$13.2
NR RT/E/S/40030 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Industrial Doors
$13.2
NR RT/LS/P/034 ISSUE 3
Published Date: 06/01/2005
Safety Procedure Manuals (aka NR/CS/RSC/034)
$13.2
NR NR/L2/CSG/10072 ISSUE 3
Published Date: 12/02/2023
Special Inspection Notices
$13.2

Best-Selling Products