NR NR/SIN/173 ISSUE 1 PDF

NR NR/SIN/173 ISSUE 1 PDF

Name:
NR NR/SIN/173 ISSUE 1 PDF

Published Date:
04/26/2018

Status:
[ Active ]

Description:

Management of Risk at User Worked Level Crossings Equipped with Power Operated Gate Openers (POGOs) or with Both Barriers and Miniature Stop Lights (MSLs)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This SIN covers all sites where the following equipment is located:

a) POGO

b) POGO and MSLs

c) Barriers and MSLs

A list of known sites is provided in appendix B, however should the Route be aware of additional sites which do not appear on the list, they should also be included.

Purpose

This Special Inspection Notice (SIN) has been issued to confirm:

a) there are no further installations of POGO or commissioning into service of any previously installed POGOs until reliability issues with the product have been addressed;

b) POGOs are only operational at sites where users fully understand how to operate crossing equipment and can safely traverse the crossing, until known issues with signage and site layout are rectified;

c) the signage and instructions at crossings where POGO remains operational are clear and give no cause for confusion.


Edition : 1
File Size : 1 file , 390 KB
Number of Pages : 10
Published : 04/26/2018

History


Related products

NR NR/L3/ELP/27052/04 ISSUE 4
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Working of Trains
$13.2
NR RT/E/C/19004 ISSUE 1
Published Date: 04/01/1995
Signalling Equipment Technical Advice Notice (SIGTAN004) Replacing Relays-Type SJ8211 Relay Units GEC-GS Geographical Units
$7.5
NR TIB 08 ISSUE 1
Published Date: 07/19/2023
Advice About Using Non-TR42 Qualified Staff and Subcontractors as Hot Weather Watchpersons
$5.7
NR NR/L3/ELP/27240/NR/DIST C01 ISSUE 5
Published Date: 12/05/2020
Inspection and Maintenance of 25 kV a.c. Switching Stations
$7.5

Best-Selling Products

EI IP-MCSP-P19
Published Date: 2012
Model Code of Safe Practice Part 19: Fire precautions at petroleum refineries and bulk storage installations, Third Edition
$87.63