NR TIB 08 ISSUE 1 PDF

NR TIB 08 ISSUE 1 PDF

Name:
NR TIB 08 ISSUE 1 PDF

Published Date:
07/19/2023

Status:
[ Withdrawn ]

Description:

Advice About Using Non-TR42 Qualified Staff and Subcontractors as Hot Weather Watchpersons

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Only Temporary Variations which apply to Maintenance and Works Delivery Watchperson locations and last no longer than 6 months will be issued.

All staff used as Watchpersons under a TV will require a planned safe system of work and will act under the guidance of a lead Watchperson with TR42 competency.

Purpose

To advise Network Rail staff that:-

1. NR/L2/TRK/001/mod14 7.2 states that Staff undertaking Watchperson duties are required to hold TR42 competence.

2. If circumstances arise where staff with TR42 competence are not available and there is an intention to use staff `who have been assessed to have suitable track experience instead, a Temporary Variation (TV) against NR/L2/TRK/001/mod14 7.2 may be submitted and supported by a Regional or Route Engineer. 


Edition : 1
File Size : 2 files , 12 MB
Number of Pages : 3
Published : 07/19/2023

History


Related products

NR NR/GN/INI/003 ISSUE 1
Published Date: 09/04/2010
Working on or Adjacent to the Conductor Rail
$7.5
NR X00250 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Signal Regulation Delay Table
$5.7
NR BRS-SM 109/3
Published Date: 07/17/1979
Position Light Ground Shunt Signal Mounting Block for Use with Westlyte Signal & Indicator
$5.7
NR NR/L2/SIG/11752/PART L ISSUE 2
Published Date: 08/01/2001
Train Detection Handbook Part L: Operating Specification
$5.7

Best-Selling Products

Digital Protection for Power Systems
Published Date: 07/01/1995
$11.7
Insulators for High Voltages
Published Date: 01/01/1988
$35.7
Vacuum Switchgear
Published Date: 04/01/1994
$29.718