NR NR/SP/ELP/21033 ISSUE 2 PDF

NR NR/SP/ELP/21033 ISSUE 2 PDF

Name:
NR NR/SP/ELP/21033 ISSUE 2 PDF

Published Date:
12/01/2005

Status:
[ Active ]

Description:

Specification for the welding of transformer tanks and conservators during manufacture

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This specification applies to new oil/synthetic liquid filled power transformers installed on the A.C. and D.C. Electrified Lines.

Purpose

This specification states the requirements for the control of welding, including supervision, materials, welding procedures, inspection, testing and also the approval of welders and operators, to achieve the appropriate quality level during the manufacture of power transformer tanks and conservators.


Edition : 2
File Size : 1 file , 150 KB
Number of Pages : 12
Published : 12/01/2005

History


Related products

NR BRS-SM 104/11-13 ISSUE C
Published Date: 07/03/2007
Stake (Angle) for Trackside Equipment
$5.7
NR NR/L3/OPS/045/3.05 ISSUE 2
Published Date: 10/03/2020
National Operating Procedure (NOP) 3.05: Radio Communication Failures
$13.2
NR NR/L3/MTC/MG0176/04 ISSUE 4
Published Date: 09/04/2010
Ellipse Work Management Handbook: Meetings Framework
$7.5
NR NR/CIV/SD/1901 ISSUE E
Published Date: 12/01/2018
Underbridge Walkways: General Notes and H&S Risk Register
$5.7

Best-Selling Products

SFSA 3
Published Date: 01/01/1976
Ultrasonic Testing of Steel Castings
$0.3
SFSA 4
Published Date: 01/01/1979
Fracture Toughness in Relation to Steel Castings Design and Application
$0.3
SFSA 5
Published Date: 01/01/1964
Solidification of Steel Castings
$15
SFSA 6
Published Date: 01/01/1973
Steel Foundry Melting Practice
$15
SFSA 7
Published Date: 01/01/1982
Gating and Risering
$15
SFSA 8
Published Date: 01/01/1984
Steel Casting Metallurgy
$15