NR NR/SP/ELP/27169 ISSUE 2 PDF

NR NR/SP/ELP/27169 ISSUE 2 PDF

Name:
NR NR/SP/ELP/27169 ISSUE 2 PDF

Published Date:
04/01/2006

Status:
[ Active ]

Description:

Isolation of Switching Stations at Electrical Control Room Boundaries to Comply with Issue of Permits-to-Work & Sanctions-for-Test Certificates

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

At switching stations where the high voltage equipment is part or dual controlled from two different Electrical Control Rooms (ECR) the following arrangements will apply for isolation of the high voltage equipment and issue of Permit-to-Work (21067/P/1) or Sanction-for-Test (21067/S/1)


Edition : 2
File Size : 1 file , 110 KB
Number of Pages : 6
Published : 04/01/2006

History


Related products

NR NR/L3/ELP/27240/NR/DIST C22P ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of ABB. 11kV and 22kV SF6 Circuit Breakers Type "SAFESIX" and Associated Equipment within the Circuit Breaker Cubicle
$5.7
NR NR/L3/SIG/11235/G210 ISSUE 2
Published Date: 09/07/2024
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules
$13.2
NR T25003 ISSUE 1
Published Date: 03/05/2016
Lineside & on Track Typical Circuits Points - Point Control & Detection - Typical Circuits - Technical Specification & Guidance
$5.7
NR T34037 ISSUE 5
Published Date: 06/07/2003
Lineside & on Track Equipment Typical Circuits TPWS - Control Circuits for Fitment to SSI Signalling Methods 1A/1B/2 - OSS Complex Control Circuits 1
$5.7

Best-Selling Products

Human Resource Management
Published Date: 07/20/1999