Name:
NR NR/SP/ELP/27169 ISSUE 2 PDF
Published Date:
04/01/2006
Status:
[ Active ]
Publisher:
Network Rail
Introduction
At switching stations where the high voltage equipment is part or dual controlled from two different Electrical Control Rooms (ECR) the following arrangements will apply for isolation of the high voltage equipment and issue of Permit-to-Work (21067/P/1) or Sanction-for-Test (21067/S/1)
| Edition : | 2 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 6 |
| Published : | 04/01/2006 |