NR NR/SP/TRK/8011 ISSUE 1 PDF

NR NR/SP/TRK/8011 ISSUE 1 PDF

Name:
NR NR/SP/TRK/8011 ISSUE 1 PDF

Published Date:
12/01/2005

Status:
[ Active ]

Description:

Management of Pan 8 & Lockspiked Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

INTRODUCTION

The derailment at West Sutton on 9th October 2001 was due to gauge spread caused by corrosion and shearing of the lockspike fastenings installed with Pan 8 baseplates on hardwood sleepers.

The failure of the lockspike is difficult to detect as it tends to occur beneath the baseplate. Therefore the following specification must be applied to the management of Pan 8 and other lockspiked track.


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 6
Published : 12/01/2005

History


Related products

NR BRS-SM 251 ISSUE B
Published Date: 04/10/1985
Mounting Strap for Point Rod Roller
$5.7
NR SMF/MG/457 ISSUE 1
Published Date: 12/04/2010
Technical Query Form
$5.7
NR NR/L2/CIV/005/04 ISSUE 1
Published Date: 06/02/2018
Drainage Systems Manual: Drainage Inspections
$18.6
NR T28335 ISSUE 1
Published Date: 09/01/2008
Lineside & on Track Equipment Typical Circuits Signals & Indicators Colour Light, Lighting Circuit, 4 Aspect Flashing double yellow (Dorman LED)
$5.7

Best-Selling Products

A Dictionary of Virology
Published Date: 12/01/1996
$15
Graphics Gems
Published Date: 05/01/1994
$17.7