Name:
NR NR/WI/CIV/143 ISSUE 1 PDF
Published Date:
08/01/2005
Status:
[ Withdrawn ]
Publisher:
Network Rail
The procedures defined herein covers works on green field sites and works affecting existing infrastructure.
This document defines the interaction of the FTN and GSM-R Project Team with Contractors, Territory Civil Engineering teams, National Track and Civil Engineers teams, and Design Managers within Major Projects and Investments (MP&I).
Purpose
This Work Instruction defines the procedures for gaining Technical Approval for works required for the FTN and the GSM-R.
The procedures aim to control the risk to Network Rail's operations and infrastructure, which may arise with the design and construction of works, whilst minimising the resources spent on gaining Technical Approval without compromising the effectiveness of the process.
| Edition : | 1 |
| File Size : | 1 file , 240 KB |
| Number of Pages : | 18 |
| Published : | 08/01/2005 |